Highway Projects FY 2014

Scheduled for Construction

For detailed information on specific local projects, click on "green" PID number in the far right column. 

Location

Project

Sponsor

Description

PID

Shawnee Road ACEO Study corridor & make recommendations to improve geometrics, ingress/egress, east congestion & upgrade traffic control devices as necessary.  Shawnee Road from Zurmehly Road to Adgate Road and Ft. Amanda Road from Breezewood Lane to Buckeye Road.  Replace existing structure over the Ottawa River with a new wider structure. Result of the study is the installation of a multi-lane round-about at the intersection of Ft. Amanda & Shawnee roads. 77305
Elizabeth & West Streets City of Lima Modify Elizabeth and West streets to one-way, one-lane operations between Elm Street and North Street.  Implement "complete streets" features.  Convert Elizabeth and West streets to two-way operations south of Elm Street and north of North Street.  90948
ALL TR 87 (Hook-Waltz Road) ACEO Replace bridge over Sugar Creek.  Approximately 0.5 miles east of SR 115. 92471
ALL WWTP City of Lima Rehab piers, guardrail and wearing surface over the Ottawa River.   Wastewater Treatment plant drive at Ottawa River. 85500
ALL SR 81 ODOT Resurface pavement with asphalt concrete from Sugar Street to IR-75. Add curb and gutters from east of the railroad to PB project just west of Neubrecht Road. 86634
ALL Lima Bike Path Phase V City of Lima Construct a 10' bike path through parts of the project area and utilize low volume roads with signed bikeways in other parts of the project area.  From Central Point Buttonbush Wetland Preserve to existing Ottawa River Bikeway; Faurot Park to Robb Park. 92337
ALL IR-75 ODOT Major rehab from interstate plan. IR-75 reconstruction from Auglaize County line through milemarker 5.53. Geometrics to be corrected. Capacity needs analyzed. Interchanges and bridges will be reconstructed. 89029
ALL SR 309 ODOT Resurface the roadway with asphalt concrete. Replace the existing curb and gutter in the Village of Elida from Pioneer Road to just west of Eastown Road-widen the roadway to meet design standards (5-12' lanes). Install new curb and gutter and improve drainage, if required. Investigate the need for sidewalks, replace 60" culvert near SLM 0.60 on SR 309. 90849
Ohio Bridge Project ACEO A three-year cooperative effort between the Ohio Department of Transportation (ODOT) and Ohio’s county engineers will replace two hundred bridges across Ohio at a cost of $100 million of ODOT funds over three years. Allen County will benefit with the replacement of seven bridges that currently are either closed or have weight limits. The three Allen County bridges to be replaced this year include bridges on two bridges near Gomer on Lincoln Highway over Pike Run and one bridge on Ream Road over Wrestle Creek. 97122