Replace Bridge over Riley Creek on SR 103 - PID 93756

Replace Bridge over Riley Creek, in the Village of Bluffton, on SR 103 (Jefferson Street).  The replacement structure will be a 37-foot wide 3-span continuous reinforced concrete slab bridge.  The new structure will include a 6'-wide sidewalk on the left (north) side.  State Route 103 will be closed during construction and traffic will be detoured.  Click this link to see an aerial map of the project site. Construction will begin about April 1, 2019, and will end about October 31, 2019.