Highway Projects FY 2020

Scheduled for Construction

For detailed information on specific local projects, click on "green" PID number in the far right column.

Location

Project

Sponsor

Description

PID

SR 117 ODOT Overlay bridge deck and approach slabs, patch and seal concrete surface on SR 117 over CSX Railroad.  Construction to begin June 1, 2020. 98522
SR 65 ODOT Replace the deck of SR 65 bridge over the Ottawa River as there are concrete box beams that are spalled and have steel strands rusted through.  Construction to begin June 1, 2020. 88306
SR 81 ODOT SR 81 bridge deck replacement over the Ottawa River.  Construction to begin May 1, 2020. 101189

Wayne-High streets

City of Lima Wayne Street from Cole Street to Central Avenue; convert from a one-way operation to a two-way operation, including resurfacing, curb & gutter, replace sidewalk, signal heads, ADA ramps.  (AKA - Phase 3 of the All-Traffic Study, PID 82576.) Modify High Street between Metcalf Street and Central Avenue; operation to remain one-way, two-lane operation.  Construction is scheduled to begin April 1, 2020.  90949
Various pedestrian facilities in Beaverdam Village of Beaverdam Construct pedestrian facilities at various in the Village of Beaverdam.  Project to achieve compliance with the American with Disabilities Act.  Construction scheduled to begin July 1, 2020.  110217
Various pedestrian facilities in LaFayette Village of LaFayette Along portions of Main and Sugar streets also where there is no street in the Village of Lafayette.  Construct sidewalks to achieve compliance with the Americans with Disabilities Act.  Construction scheduled to begin July 1, 2020.  110216